Specification AgeRangeDescription : adult Brand : DWFSKZKV BulletPoint1 : Controller type: Push Button BulletPoint2 : Material: paper Color : 160a 4p Ats ControllerType : Push Button Department : Unisex Adult ExternallyAssignedProductIdentifier : 9435679518104 HardwarePlatform : PC ItemName : DWFSKZKV ATS Dual Power Automatic Transfer Switch AC220V 100A 160A 250A 4P for Diesel Generator Parts Control Module Circuit Breaker (Color : 160A 4P ATS) ItemPackageDimensions_Height : 1 centimeters ItemPackageDimensions_Length : 3 centimeters ItemPackageDimensions_Width : 2 centimeters ItemPackageQuantity : 1 ItemTypeKeyword : process-controllers Manufacturer : DWFSKZKV Material : paper ModelName : DWFSKZKV ModelNumber : DWFSKZKV NumberOfBoxes : 1 NumberOfItems : 1 PartNumber : DWFSKZKV ProductDescription : 8.Wiring methods of the switch8.1 The primary wiring diagram to see the picture 3. 8.2 The control power is derived from normal power,emergency power cand N phases.8.3 and line control power AC220V connected with terminal 102103,104105 respectively,102 and 104 are normal power and emergency power live line respective.8.4 Terminal 101,106 are act as signal lamp to control the power supply. Note:101 and 106 couldn't be connected with any other lines.8.5 When above(under) input line, under(above)terminaland line A,B,C phases will be connected with copper lines or lines acting as output.9.The instruction of debug the switch9.1 Connect the normal power(),emergency power() to the corresponding copper barrespectively;Automatic debuggingNormal power supply with electric,emergency power supply with Electric,switchline switch onNormal power supply without electric,emergency power supply with electric,switch switch onNormal power supply with electric,switch line switch on(Refer to the switch panel white indicating arrowhead)Remote debuggingPress the bush button SB1,then the switchline switch onPress bush button SB2,then the switch line switch onAutomatic/Remote(Manual)debuggingWhen dial the function selection switch to the automatic position: the switch should act as the item requiredWhen dial the function selection switch to the remote (manual) position, the switch should act as the item required9.2 When the switch is in the position of switch online or line,the signal lamp on the panel should indicate correspondingly;9.3 After finished the debugging,close the power supply firstly,and transfer the switch to the "0"position by handle.(Middle position,refer to the switch panel white indicatingarrowhead). ProductSiteLaunchDate : 2024-05-04T03:45:00.855Z Size : One Size UnitCount : 1 UnspscCode : 39122200